Streets



WELCOME
 
TO FOUNTAIN STREETS DEPARTMENT

the 9 members of the 2023 streets crew standing in front of truck

Did you know there are 9 City employees that maintain:

-108
miles of roadways
-7 bridges

-7 traffic signals
-2 calming speed limit signs
-9 lighted pedestrian crossings of 142 pedestrian crossings
-645 storm drain inlets
-194 drainage culverts
-173 manholes
-273 drainage outfall structures
-Several detention ponds
-Several miles of storm drain pipes
 

The Street & Drainage Division performs the following major responsibilities:

  • Snow Removal & Ice Control
  • Street Sweeping
  • Street Paving, Patching and Crack Sealing
  • Grading - Gravel Roads, Alley ways
  • Street Signs, Traffic Signs and Traffic Signals
  • Traffic Control - Parades, Emergencies
  • Storm Drainage - Curbs, Culverts, Storm Drains, City owned Detention Areas
  • Mitigation - Mowing & Weed Control in Street/Drainage Right of way, Detention Ponds, Tree Trimming
  • Community Special Events including Dumpster Days, Senior Citizen Curbside Service, Labor Day Parade, Thunder in the Valley.

   TO REPORT A POTHOLE OR OTHER STREET RELATED ISSUE 
CLICK HERE